A bathroom renovation in Ireland costs roughly €5,000–€8,000 for a basic job, €8,000–€15,000 mid-range, and €15,000+ at the high end (indicative 2026 ranges). The main drivers are the room size, how much tiling is involved, the quality of the sanitaryware and whether you’re moving any plumbing.

Bathroom renovation cost by spec

TierTypical specIndicative 2026 cost
BasicSame layout, standard suite, part-tiled, budget shower€5,000–€8,000
Mid-rangeQuality suite, fully tiled, thermostatic shower, some layout tweaks€8,000–€15,000
High-endPremium sanitaryware, large-format tiles, wet room or freestanding bath, underfloor heating€15,000+

Size matters: a small en-suite sits at the lower end, while a large family bathroom with extensive tiling pushes toward the top of each range.

What’s included

A bathroom quote should cover:

  • Strip-out and disposal of the old suite.
  • Plumbing — including any relocation of the toilet, bath or shower.
  • Electrical — extractor fan, lighting, shaver socket, any underfloor heating.
  • Tanking/waterproofing, especially for showers and wet rooms.
  • Tiling — walls and floor, plus the tiles themselves.
  • Sanitaryware — toilet, basin, bath, shower enclosure and brassware.
  • Plastering, painting and making good.
  • Labour across multiple trades.

Wet room note

A wet room is a fully waterproofed, open shower space with no raised tray. It looks sleek and is easier to clean, but it costs more than a standard bathroom because the whole floor must be tanked and laid to a gentle fall toward the drain. If you’re considering one, expect to budget from the mid-range up, and use a fitter experienced in tanking — getting the waterproofing right is critical.

What affects the price

  • Layout changes. Moving the toilet or shower means new drainage runs, which is the costliest type of change.
  • Tiling area. A fully tiled room uses more tiles and far more labour than a part-tiled one.
  • Sanitaryware quality. Budget suites versus premium brassware and large baths is a big swing.
  • Extras. Underfloor heating, heated towel rails, niche shelving and large-format tiles all add cost.
  • Room condition. Old pipework, rot or uneven walls add prep.

Ways to save

  • Keep the layout. Leaving the toilet, bath and shower where they are avoids expensive drainage work.
  • Part-tile. Tile the wet areas fully and paint the rest with bathroom-grade paint.
  • Choose mid-range sanitaryware — the jump from budget to mid is worthwhile; the jump to premium often isn’t for the money.
  • Standard tile sizes are quicker to lay than large-format or mosaic, saving labour.
  • Get at least three written quotes, itemised so you can see labour, tiles and sanitaryware separately.

There are no SEAI grants for bathrooms, but if you’re already renovating it’s a sensible time to look at your home’s wider energy performance — see how to improve your BER rating. Many homeowners tackle the bathroom alongside a kitchen renovation to share trades and minimise disruption.

Final tips

Confirm whether the quote includes the tiles and sanitaryware or just labour to fit your supplied items — this is a common source of confusion. Allow a contingency of around 10–15% for hidden issues behind old tiles, and get the full scope in writing before any work begins.